Customer
Vantor Rail
Sector
Rail, Nordics
Uses
Halden agent
Since
2026
The work
Every repair at Vantor’s depots has to meet the maintenance standard before a train leaves. Halden checks each log against it, and an engineer approves before departure.
The problem
Repair logs were checked by sampling at the end of the week, long after the trains had left.
A missing torque value is not paperwork. It is a bogie on the main line.
What changed
Halden reads each log as it is filed and checks every step against the standard, twice. Missing values and out-of-range readings go to the duty engineer.
Approvals take seconds, because the screen shows only what is in doubt.

The review queue at Depot 3: every log approved by an engineer.

Maintenance plans, Depot 3.

Depot 3 under construction, 2024.
Twelve months on
Year one.
100
% of logs
Checked before the train leaves.
38
seconds
Average approval by an engineer.
0
trains held
For paperwork since the pilot.

Daniel Owusu
Head of maintenance, Vantor Rail
Research
Selam Haile
Deployment
Leo Tran
Vantor Rail
Three depots, 80 engineers
Products
Agent

Next story, 08 / 08


