Two solvers, one answer.
Grid studies an engineer can sign


Jonas Ek, Henrik Sand
Halden Labs
4 November 2025
·
10 min read

Abstract
For grid connection studies we run two independent load-flow solvers and compare every bus and line. Across 240 studies from Norrfield the solvers disagreed on 19, and each disagreement pointed to a modelling error a person then fixed. No study left the agent with an undetected overload.
Studies
240
Disagreements
19
Missed overloads
0
Per study
4 min
Paper

